ADA Sidewalk Rehabilitation Addendum #2

ADA Sidewalk Rehabilitation Project

City of Tuscaloosa Project No. A10-0990/ A09-0899

November 16, 2010

ADDENDUM NO. 2

ITEM #1: Contract time Revision

A contingency has been added to the contract time period that states that five (5) calendar days will be added to the existing contract time for each alternate awarded.

ITEM #2: Ramp Replacement

The costs for a truncated dome detectable warning strip should be included in the line item price for each new Curb Ramp. The line item Truncated Dome Strip is for a stand alone application of a detectable warning strip.

END OF ADDENDUM #2

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s


%d bloggers like this: