Archive for May, 2011

COT – Elm Street Drainage Phase III

May 25, 2011

Addendum #1 for the referenced project is below:

Addendum #1

The Bid Tab in Excel format is below:

ELM III Bid Tab Sheet

Advertisements

COT – Elm Street Phase III – Pre-Bid Attendees List, Etc.

May 25, 2011

Please see the Pre-Bid Meeting Attendee List

Pre-Bid Sign-Up Page 1

Pre-Bid Sign-Up Page 2

We plan to issue an addendum later today to address the scrap metal at the old railroad line (this is the property of Liberty Recyling angd they will move it prior to construction) and also how to address the Railroad Insurance/Permits.

We apologize for the delay with this information; our internet and phone have been down since Sunday night. We do check the voicemail often so please leave a message if you need something.

Elm Street Drainage Project – Phase III for the City of Tuscaloosa; Bid Date Set

May 12, 2011

The City of Tuscaloosa will receive bids for the Elm Street Drainage Project – Phase III on Thursday, May 26, 2011 until 2:00 pm. Bids will be opened in the Council Chambers.

A mandatory Pre-Bid Conference will be held on Wednesday, May 18, 2011 at 2:00 pm in the conference room of the Office of City Engineer.

Please refer to Bid documents for all official information (Bid Documents take precedence over any information posted here).

Plans will be available on or after Monday, May 16 at our office (903 1/2 Main Avenue, Northport, Alabama 205-345-0746 – please call before you come by to make sure someone is here) and at the University Blvd. location of Tuscablue.

A copy of the advertisement and bid sheet are attached.Elm III AdvertisementELM III Bid Tab Sheet